MODERN HOUSING
HERITAGE
日本語 / EN

BUILDING STUDY / NEXT21

Osaka Gas Experimental Housing NEXT21

An occupied housing laboratory combines skeleton and infill, elevated streets and greenery, testing the continuing renewal of homes and daily life.

Osaka Gas Experimental Housing NEXT21 at a glance

Location
Shimizudani, Tennoji-ku, Osaka, Japan
Completion / construction period
1993
Recorded architect / design organization
Osaka Gas NEXT21 Construction Committee; coordination by Yositika Utida and Shu-Koh-Sha

Homes, design and lived histories ↓ · Sources and checks ↓

Read the building’s story ↓

READING THE PHOTOGRAPHS

Reading façades and shared spaces through photographs

Compare views of colour placement, façade depth and shared entrances to understand this building’s particular composition.

NEXT21 exterior: stacked dwellings and greenery within the city.

NEXT21 exterior: stacked dwellings and greenery within the city.

The frame holds differing enclosures and planting, with setbacks above. The complete published image situates this layered system in the neighbouring city.

An elevated street at NEXT21, with columns, railings and planting.

An elevated street at NEXT21, with columns, railings and planting.

The route passes planting and entrances while remaining open to the air. Continuous circulation and the depth of domestic thresholds connect movement with an outdoor extension of the home.

THE BUILDING / ITS STORY

Contents for this building
  1. Testing future housing while living in it
  2. Retaining the skeleton while changing the home
  3. Elevated streets with choices of route
  4. Planting and domestic life continue to evolve

Testing future housing while living in it

Osaka Gas built NEXT21 in 1993 and began employee-family habitation experiments in 1994. Its eighteen-home building was designed by the construction committee, coordinated by Yositika Utida and Shu-Koh-Sha. Completion was a starting point for continued examination of domestic life, environment and energy.

  1. primary NEXT21について ↗

    大阪ガス · 1993年建設、1994年から実居住実験、2025年度第6フェーズ。完成年と実験開始年を区別。

  2. primary 建築概要・受賞歴・検討体制 ↗

    大阪ガス · 18戸、地上6階地下1階、建設委員会設計、内田祥哉+集工舎総括、木村俊彦構造設計。

Independent bilingual summary of the specified source passages; readings of visible form are identified in the text.

Retaining the skeleton while changing the home

Separating skeleton and infill allows changes to unit boundaries, facade parts and wet areas. Shared service shafts and pipes beneath the elevated streets support that flexibility. Generous storey height, replaceable components and a design rulebook turn a long-life ambition into physical routes and procedures for alteration.

  1. primary 建築システム ↗

    大阪ガス · Read the separation of structure and adaptable components, changes to dwelling sizes and external walls, pipes under shared passages, common service shafts and continuity of design rules. A hundred years is the project’s stated design objective.

Independent bilingual summary of the specified source passages; readings of visible form are identified in the text.

Elevated streets with choices of route

Vertical routes and bridges create choices rather than a single access corridor. The owner explains the arrangement as reconnecting house and street within collective housing. Surveys in 1994–95 recorded play, conversation and domestic work outside homes, providing evidence for examining the design during that period.

  1. primary 立体街路 ↗

    大阪ガス · Read the two vertical loops, bridges at the third and fifth floors, fourth-floor garden route, and observed conversation, play and other activities. The observations are dated to the study period.

Independent bilingual summary of the specified source passages; readings of visible form are identified in the text.

Planting and domestic life continue to evolve

Planting followed investigation of surrounding greenery and birdlife. Growth brought maintenance and adjustments, including changes responding to residents. Participatory wisteria care began in 2022. A sixth experimental phase started in fiscal 2025. Continuity here includes revising relationships among residents, nature and neighbourhood through continuing care of an evolving landscape.

  1. primary 建物緑化 ↗

    大阪ガス · 周辺調査、野鳥継続観察、植栽量調整、2022年以降のフジの手入れ。写真と断面説明を区別。

  2. primary NEXT21について ↗

    大阪ガス · 1993年建設、1994年から実居住実験、2025年度第6フェーズ。完成年と実験開始年を区別。

Independent bilingual summary of the specified source passages; readings of visible form are identified in the text.

A lens on value

Read dwelling arrangements, shared spaces, technology and change through identified public records.

Records and comparisons

Dates and roles follow the stated source scope; formal comparison is distinguished from documented influence.

Read the building in depth

Related people

Yositika Utida / Osaka Gas NEXT21 Construction Committee

Sources and checks

  1. primary NEXT21について ↗

    大阪ガス · 1993年建設、1994年から実居住実験、2025年度第6フェーズ。完成年と実験開始年を区別。

  2. primary 建築概要・受賞歴・検討体制 ↗

    大阪ガス · 18戸、地上6階地下1階、建設委員会設計、内田祥哉+集工舎総括、木村俊彦構造設計。

  3. primary 建築システム ↗

    大阪ガス · Read the separation of structure and adaptable components, changes to dwelling sizes and external walls, pipes under shared passages, common service shafts and continuity of design rules. A hundred years is the project’s stated design objective.

  4. primary 立体街路 ↗

    大阪ガス · Read the two vertical loops, bridges at the third and fifth floors, fourth-floor garden route, and observed conversation, play and other activities. The observations are dated to the study period.

  5. primary 建物緑化 ↗

    大阪ガス · 周辺調査、野鳥継続観察、植栽量調整、2022年以降のフジの手入れ。写真と断面説明を区別。

Editorial review: 2026-10-25

Edited by: Modern Housing Heritage · Editorial and sourcing policy · Page updated:

Compare buildings