62 modernist housing cases: homes, streets and collective life
A numbered route through building-specific stories, photographs and sources across Japan, Europe, North America, Asia and Latin America.
BUILDING STUDY / JUSTUS-VAN-EFFEN
Early modern housing organised around courtyards, raised access galleries and shared services.


THE BUILDING / ITS STORY
Completed in 1922, Brinkman’s municipal housing complex originally contained 264 homes. His experience with industrial buildings informed the coordination of deliveries, movement, waste and heating. The original count should be distinguished from later apartment combinations. The project brings carefully worked brick architecture together with rational domestic logistics, broadening the story of early modern housing beyond white boxes.
Arjan Hebly / TU Delft, DASH9(14),2018,130–139 · Brinkman1922; original264homes; architectural/logistical organisation; restoration co-author and awards.
Knoll, partner in the WMF/Knoll Modernism Prize · Raisedgallery and service routes, concrete circulation, windows/courtyards,1980sintervention,2012restoration and contemporary services.
World Monuments Fund · Read the original PDF cover and Jury Citation (PDF pp.1–2, printed pp.2–3): 2016 award, three restoration practices, 264 dwellings, design 1919–1921 and completion 1922, cantilevered walkway, conservation and contemporary services. Reading scope: the cover and the two pages of the Jury Citation.
The broad raised gallery connects upper entrances while tying the housing blocks into a circulation network. Reinforced concrete appears in galleries, stairs and balustrades, with courtyards of different sizes below. Gates and openings mediate between street and communal interior spaces. This offers a specific basis for comparison with later housing streets, as a typological comparison of circulation and shared ground.
Knoll, partner in the WMF/Knoll Modernism Prize · Raisedgallery and service routes, concrete circulation, windows/courtyards,1980sintervention,2012restoration and contemporary services.
World Monuments Fund · Read the original PDF cover and Jury Citation (PDF pp.1–2, printed pp.2–3): 2016 award, three restoration practices, 264 dwellings, design 1919–1921 and completion 1922, cantilevered walkway, conservation and contemporary services. Reading scope: the cover and the two pages of the Jury Citation.
Window sizes and positions relate to domestic functions, adding variation to the repeated facades. Central bathing and washing, heating and waste arrangements also formed part of the design. Shared circulation and common provision can be studied together through the ways they support the individual home. The courtyard photographs make the relationship among entrances, galleries and brick detail visible.
Knoll, partner in the WMF/Knoll Modernism Prize · Raisedgallery and service routes, concrete circulation, windows/courtyards,1980sintervention,2012restoration and contemporary services.
Arjan Hebly / TU Delft, DASH9(14),2018,130–139 · Brinkman1922; original264homes; architectural/logistical organisation; restoration co-author and awards.
Following an unsatisfactory 1980 sintervention, the team of Molenaar&Co, Hebly Theunissen and Michael van Gessel completed a more comprehensive restoration in 2012. Recovered brick and opening details were combined with contemporary heating and solar-thermal provision. The work received the 2016 WMF/Knoll Modernism Prize. It demonstrates how conservation can reconnect architectural character with continuing residential comfort.
Knoll, partner in the WMF/Knoll Modernism Prize · Raisedgallery and service routes, concrete circulation, windows/courtyards,1980sintervention,2012restoration and contemporary services.
Arjan Hebly / TU Delft, DASH9(14),2018,130–139 · Brinkman1922; original264homes; architectural/logistical organisation; restoration co-author and awards.
World Monuments Fund · Read the original PDF cover and Jury Citation (PDF pp.1–2, printed pp.2–3): 2016 award, three restoration practices, 264 dwellings, design 1919–1921 and completion 1922, cantilevered walkway, conservation and contemporary services. Reading scope: the cover and the two pages of the Jury Citation.
Early modern housing organised around courtyards, raised access galleries and shared services.
Project dates and the scope of blocks and districts follow the original records.
Arjan Hebly / TU Delft, DASH9(14),2018,130–139 · Brinkman1922; original264homes; architectural/logistical organisation; restoration co-author and awards.
Knoll, partner in the WMF/Knoll Modernism Prize · Raisedgallery and service routes, concrete circulation, windows/courtyards,1980sintervention,2012restoration and contemporary services.
World Monuments Fund · Read the original PDF cover and Jury Citation (PDF pp.1–2, printed pp.2–3): 2016 award, three restoration practices, 264 dwellings, design 1919–1921 and completion 1922, cantilevered walkway, conservation and contemporary services. Reading scope: the cover and the two pages of the Jury Citation.
Editorial review: 2026-10-25